

2015 – Present
CMC Rocks QLD
A fully temporary powered festival city across four campgrounds and 126 acres, sustained 24/7 by 98 generators. QR-coded distribution boards and live chat let campers report a fault straight to the crew.
Temporary power and licensed event electricians for the Gold Coast, Brisbane and Queensland, planned and designed at our Arundel head office. Gold Coast based since 1996.
Our head office
Where EVENTelec started in 1996.
EVENTelec was established on the Gold Coast in 1996 as Rentelec, and rebranded to EVENTelec in 2007. Our head office is at 12 Supply Court, Arundel, where one call reaches the people who plan, design and deliver the job.
Gold Coast events have been part of our work from the start: the Commonwealth Games, the Gold Coast Marathon, the WSL Gold Coast Pro, the Sanctuary Cove Boat Show, Blues on Broadbeach and the Pacific Air Show. Call head office on (07) 5597 4477.
What we deliver in Queensland
Brisbane
From an operating tennis stadium to a world leaders’ summit.
We have powered the Brisbane International every year since 2014 – eleven consecutive years. Generators are installed in the early hours to prevent disruption to players, staff and broadcast, keeping the stadium fully functional and tournament-ready.
Our Brisbane work also includes the Brisbane G20 Leaders Summit.
In Brisbane
Proof
Some of the state’s biggest events run on EVENTelec systems.


2015 – Present
A fully temporary powered festival city across four campgrounds and 126 acres, sustained 24/7 by 98 generators. QR-coded distribution boards and live chat let campers report a fault straight to the crew.


2014 – Present
Generators installed in the early hours to prevent disruption to players, staff and broadcast, keeping the stadium fully functional and tournament-ready.
Also in Queensland
Gold Coast. The Commonwealth Games, Gold Coast Marathon, WSL Gold Coast Pro, Sanctuary Cove Boat Show, Blues on Broadbeach and the Pacific Air Show.
Brisbane and beyond. The Brisbane G20 Leaders Summit, the Noosa Triathlon and CMC Rocks QLD, with 2,600 powered campsites.
Gold Coast based since 1996 - and every Supercars-promoted race powered since the same year.
Services
One team from site walk to de-rig. Every service is delivered from our Arundel head office.

In-house overlay design software and a five-principle methodology that targets cost efficiency at every stage without compromising safety or redundancy.

Distribution boards from 32amp to 2500amp, automatic transfer switches, cable up to 400amp powerlock, LED broadcast panels, exit signage and cable protection.

Turnkey TV compounds, media centres and redundancy design for live broadcast, delivered under our dedicated Broadcast Power division.

NECA National Safety Management System plus our own software - induction sign-ons, pre-start registers and installation certificates digitally logged against AS codes.
Services and event types
Credentials
All employees hold valid licences and possess extensive event experience in planning, executing and commissioning temporary electrical distribution overlay. Everything below is current and can be issued to your compliance team on request.
Servicing all six states and territories, with branches in Queensland, New South Wales and South Australia.
ABN 27 524 312 860
ACN 124 249 690
Bank of Queensland, Mermaid Waters
Hire Company of the Year at the 2024 Australian Event Awards – judged on the standards we hold ourselves to, not just the events we power.
The most organised and efficient company we have ever used in the 40 years we have been running.
Director Tournaments · TA Golf